Run # 1513 Tape: YA0252 Shift: SHIFT6 Date: 961111 Time: 13:18:11 # of events: 1186 Start block: 7000 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S_BAR*VETO       S3/S4/S5: 350 mV                  VETO:    127 mV

Magnet conf.:          Magnet#1:     0 A/ -0.0 T    Magnet#2:     0 A/ -0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

Production run, S3 threshold 350 mV, beam def. S1*V0bar*S2bar, MTPCL jumper 3 off, pregate. - STOPPED BY DAQ FAILURE
Atmospheric pressure:   945.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.2 C     drift velocity:  1.39423
drift: 12.989  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.9 C     drift velocity:  1.40043
drift: 12.941  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.1 C     drift velocity:  2.31364
drift: 18.996  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.3 C     drift velocity:  2.32938
drift: 18.949  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V