Run # 1567 Tape: YA0284 Shift: SHIFT1 Date: 961116 Time: 20:58:29 # of events: 13411 Start block: 7000 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S3_BAR*VETO      S3/S4/S5: 200 mV                  VETO:    127 mV

Magnet conf.:          Magnet#1:     0 A/ -0.0 T    Magnet#2:     0 A/ -0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

Production run, beam def.: S1*V0_bar*S2, MTPCL jumper 3 off, pregate, S3 threshold 200 mV - STOPPED NORMALLY
Atmospheric pressure:   964.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.1 C     drift velocity:  1.39751
drift: 12.992  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.9 C     drift velocity:  1.39363
drift: 12.942  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.0 C     drift velocity:  2.31122
drift: 18.995  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.2 C     drift velocity:  2.32673
drift: 18.942  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V