Run # 1576 Tape: YA0288 Shift: SHIFT4 Date: 961117 Time: 18:36:47 # of events: 110 Start block: 344615 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S3_BAR*VETO      S3/S4/S5: 200 mV                  VETO:    127 mV

Magnet conf.:          Magnet#1:     0 A/ -0.0 T    Magnet#2:     0 A/ -0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

Production run, beam def.:S1*V0_bar*S2, MTPCL jumper 3 off, pregate, S3 threshold 200 mV. Restarted after reseting due to PE light on MM, (VME OAXX). Beam intensity reduced by about factor 2 to 42k on S1. - STOPPED BY RC FAILURE
Atmospheric pressure:   953.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.0 C     drift velocity:  1.39743
drift: 12.992  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.8 C     drift velocity:  1.39199
drift: 12.941  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.1 C     drift velocity:  2.31099
drift: 18.995  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.3 C     drift velocity:  2.32584
drift: 18.941  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V