Run # 1606 Tape: YA0298 Shift: SHIFT4 Date: 961119 Time: 19:55:53 # of events: 0 Start block: 51091 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S3_BAR           S3/S4/S5: 30 mV                   VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

Peripheral production run. 30 mV threshold on S3. -
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V