Run # 1961 Tape: YA0355 Shift: SUSA/DEEDEE Date: 980523 Time: 21:00:44 # of events: 1 Start block: 410349 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: OFF TOFG: ON
Beam: P         Energy:  100 GeV/n   Target:P            Thickness:     20 mg

Trigger: B*S4-BAR           S3/S4/S5: 8 mV                    VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

100 GeV/c production run (after restart of low-voltage MacIntosh) - STOPPED BY DAQ FAILURE
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: AR:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1160/113  V   gating grid:-115/+-4  V

VT2:
gas: AR:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1050      V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V