Run # 2612 Tape: YA0402 Shift: RENFORDT Date: 981201 Time: 01:15:51 # of events: 802 Start block: 366550 Last block:___________ DAQ conf.: VT1: ON VT2: OFF MTL: OFF MTR: OFF TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:PB           Thickness:    224 mg

Trigger: B                  S3/S4/S5: 10 mV                   VETO:    128 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

FTPC test,Pb beam,12musec delay,low volt off,Udrift 6.5KV - STOPPED NORMALLY
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1110/108  V   gating grid:-115/+-4  V

VT2:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 990       V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V