Run # 4012 Tape: YA0759 Shift: FREUND Date: 1012 Time: 20:10:39 # of events: 11276 Start block: 432448 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  158 GeV/n   Target:PB           Thickness:    336 mg

Trigger: S1*S2PR*V0*S3BA    S3/S4/S5: 20 mV                   VETO:   1050 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run Pb-Pb central. VT2 S1 CT6 off. - STOPPED BY DAQ FAILURE
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1111/108  V   gating grid:-115/+-4  V

VT2:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 990       V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V