Run # 1148 Tape: YB0009 Shift: HH Date: 960911 Time: 18:17:38 # of events: 204 Start block: 0 Last block:___________ DAQ conf.: VT1: OFF VT2: ON MTL: OFF MTR: OFF TOF: OFF TOFG: OFF
Beam: LASER     Energy:  158 GeV/n   Target:  NONE       Thickness:     14 mg

Trigger: LASER              S3/S4/S5: -6 mV                   VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

VT2 laser calibration run, before source was applied to saleve fieldcage - STOPPED NORMALLY
Atmospheric pressure:   959.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 21.1 C     drift velocity:  1.39028
drift: 12.989  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.8 C     drift velocity:  1.39283
drift: 12.932  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.1 C     drift velocity:  2.32515
drift: 18.996  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.4 C     drift velocity:  2.32709
drift: 18.994  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V