Run # 1331 Tape: YA0182 Shift: SHIFT 4/MG Date: 961021 Time: 22:29:26 # of events: 1000 Start block: 452473 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: OFF TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   T2        Thickness:      0 mg

Trigger: B*VETOBAR          S3/S4/S5: 80 mV                   VETO:    -51 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

multitarget calibration run, target T2 Restarting after DAQ problems - STOPPED BY DAQ FAILURE
Atmospheric pressure:   971.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.2 C     drift velocity:  1.39977
drift: 13.002  kV        sense wires: 1110/1010 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.7 C     drift velocity:  1.40300
drift: 12.979  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.1 C     drift velocity:  2.31258
drift: 18.995  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.3 C     drift velocity:  2.32314
drift: 18.978  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V