Run # 1465 Tape: YA0228 Shift: SHIFT7 Date: 961107 Time: 07:16:06 # of events: 17645 Start block: 7000 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S3BAR            S3/S4/S5: 180 mV                  VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

Peripheral run with S3bar(Threshhold 180 mV) only and S2bar(Threshhold 180 mV) - STOPPED BY DAQ FAILURE
Atmospheric pressure:   966.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.3 C     drift velocity:  1.39608
drift: 12.988  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.8 C     drift velocity:  1.40027
drift: 12.941  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.0 C     drift velocity:  2.31457
drift: 18.996  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.2 C     drift velocity:  2.32673
drift: 18.955  kV        sense wires: 1000/1070 V   gating grid:-110/+-50 V