Run # 1588 Tape: YA0293 Shift: SHIFT2 Date: 961119 Time: 01:09:46 # of events: 38 Start block: 7000 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  157 GeV/n   Target:   PB        Thickness:    224 mg

Trigger: B*S3_BAR           S3/S4/S5: 180 mV                  VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/ -0.0 T    Magnet#2:     0 A/ -0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

peripheral production run,threshold S2prime 214mV,s3 180mV - STOPPED BY DAQ FAILURE
Atmospheric pressure:   954.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.: 20.0 C     drift velocity:  1.39515
drift: 12.991  kV        sense wires: 1110/1060 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.: 19.8 C     drift velocity:  1.39364
drift: 12.942  kV        sense wires: 970       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 20.0 C     drift velocity:  2.31355
drift: 18.995  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.: 21.2 C     drift velocity:  2.32536
drift: 18.939  kV        sense wires: 1030/1100 V   gating grid:-110/+-50 V