Phase 1: Tracking quality assessmentPhase 2: dE/dx
- Selection
- Full event scan, reactions available:
How to use it: practical details. Look at some typical situations: gallery.
p+p min. bias Run 1209 latest test events
p+Pb CD>=7 Run 1768 pilot run
- Bin-by-bin track scan is available for p+Pb (CD>=7).
How to use it: practical details. Guide to the world of iflags.
Look at our observations.- Next round of bin-by-bin track scan in p+Pb (CD>=7).
Changes made in this production are explained here.
Instead of 'ppbc' use 'ppbc_new': distribution of work and results.- The last bin-by-bin track scan in p+Pb (CD>=2).
Distribution of work and results.- Result: the client/plugin called reform (soon).
- Bin-by-bin track scan for Pb+Pb central.
How to use it: practical details.
Distribution of work and results.- Final bin-by-bin scan for p+Pb (CD>=3).
For description see four lines higher. Use 'pa' in the event field.
Distribution of work and results.Phase 3: Feed-down
- New ideas on calculation of the global dE/dx (soon).
- First results on quality check of dE/dx calibration.
Phase 4: SpectraNotes
- Old results, status in May 1999.
- Gábor's note on correction of dE/dx, and on usage of correction tables.
- Ferenc's note on dE/dx fits and on Landau distributions.
Comments, opinions, corrections are welcome:
Ferenc.Sikler@cern.ch