The major problems were examined and hopefully put right:The program reform and subprograms: structure.
- Split tracks
- Lost points
- Sensitive volumes
- 'Spirals'
The following plots are based on 17083 p+Pb central (CD>=7) events.
Split tracks
- p+Pb central
Proposed cut distance for split tracks:
1.5cm
- Pb+Pb central
Lost points
- p+Pb central
Proposed cut distance for lost points: 1cm
- Pb+Pb central
High and low y values
Padrow shapes in vt
![]()
![]()
Padrow shapes in mt
There are padrows with four different lengths: 67.58cm, 68.13cm, 68.57cm and 69.20cm.
Potential points
- new- old
'Spirals'
- p+Pb central
Proposed cut for spirals on average residuals: 0.25cm
- Pb+Pb central