Run # 629 Tape: Shift: H.RUDOLPH Date: 951109 Time: 21:29:24
# of events: 41 Start block: 25617 Last block:___________
DAQ conf.: VT1: OFF VT2: ON MTL: OFF MTR: OFF TOF: OFF TOFG: ON
Beam: PB Energy: 158 GeV/n Target:T1 Thickness: 860 mg
Trigger: BI*VBAR S3/S4/S5: 0 mV VETO: 100 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
central trigger, vt2, ped offset = 20 - STOPPED NORMALLY
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:90%/CO2:10% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1050/1040 V gating grid:-90/+-45 V
VT2:
gas: NE:90%/CO2:10% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 930 V gating grid:-90/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1022/1097 V gating grid:-95/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1010/1085 V gating grid:-95/+-50 V