Run # 654 Tape: YA0059 Shift: SHIFT6 Date: 951112 Time: 00:34:26
# of events: 766 Start block: 7000 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: OFF TOFG: OFF
Beam: PB Energy: 158 GeV/n Target:PB Thickness: 224 mg
Trigger: PEDESTAL S3/S4/S5: 820 mV VETO: 100 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Pulser Calibartion - STOPPED NORMALLY
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1070/1030 V gating grid:-110/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 960 V gating grid:-100/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1022/1097 V gating grid:-95/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1010/1085 V gating grid:-95/+-50 V