Run # 721 Tape: YA0069 Shift: SHIFT7 Date: 951117 Time: 00:15:55 # of events: 1 Start block: 24051 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  158 GeV/n   Target:T1           Thickness:    224 mg

Trigger: ERING*BS4BAR       S3/S4/S5: 820 mV                  VETO:    100 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run - STOPPED BY RC FAILURE
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1070/1030 V   gating grid:-110/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 960       V   gating grid:-110/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1022/1097 V   gating grid:-95/+-50  V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1010/1085 V   gating grid:-95/+-50  V