Run # 849 Tape: YA0111 Shift: SHIFT1 Date: 951128 Time: 14:31:09
# of events: 11100 Start block: 316211 Last block:___________
DAQ conf.: VT1: OFF VT2: OFF MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 158 GeV/n Target:K-ZERO Thickness: 379 mg
Trigger: VETOBAR*BI S3/S4/S5: 814 mV VETO: 101 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
K-zero run, VTPCs off;LV tripped at 14:14; Pedestal taken - STOPPED BY DAQ FAILURE
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1070/1030 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 960 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1022/1097 V gating grid:-95/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1010/1085 V gating grid:-95/+-50 V