Run # 865 Tape: YA0115 Shift: SHIFT6 Date: 951129 Time: 22:49:42 # of events: 3169 Start block: 488689 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  158 GeV/n   Target:T1           Thickness:    224 mg

Trigger: B*S4BAR*WINDOW     S3/S4/S5: 814 mV                  VETO:    105 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run, back to central trigger - STOPPED NORMALLY
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1070/1030 V   gating grid:-115/+-45 V

VT2:
gas: NE:91%/CO2:9%             Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 960       V   gating grid:-115/+-45 V

MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1022/1097 V   gating grid:-95/+-50  V

MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5%  Temp.:  0.0 C     drift velocity:  0.00000
drift: 0       kV        sense wires: 1010/1085 V   gating grid:-95/+-50  V