Run # 987 Tape: YA0137 Shift: SHIFT 2 Date: 951209 Time: 23:06:36
# of events: 2602 Start block: 335843 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 158 GeV/n Target:T1, S Thickness: 1165 mg
Trigger: BI*EVETO S3/S4/S5: 814 mV VETO: 101 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
S target run. Previous run ended because producer crashed. Two channels in MTPCR had DSP busy stuck high. OS9 re-booted and pedestal run taken. - STOPPED BY DAQ FAILURE
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1070/1030 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 960 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1022/1097 V gating grid:-95/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0 kV sense wires: 1010/1085 V gating grid:-95+-50 V