Run # 1364 Tape: YA0190 Shift: SHIFT 7 Date: 961027 Time: 13:41:55
# of events: 4637 Start block: 291063 Last block:___________
DAQ conf.: VT1: OFF VT2: OFF MTL: ON MTR: ON TOF: OFF TOFG: ON
Beam: PB Energy: 157 GeV/n Target: "K0S" Thickness: 0 mg
Trigger: B*VETOBAR S3/S4/S5: 0 mV VETO: -100 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
K0s production. vtx2 at -1000 amps. After DAQ crashed. - STOPPED BY DAQ FAILURE
Atmospheric pressure: 970.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 20.3 C drift velocity: 1.39872
drift: 12.989 kV sense wires: 1110/1010 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 19.7 C drift velocity: 1.40071
drift: 12.941 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 20.0 C drift velocity: 2.31003
drift: 18.997 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 21.2 C drift velocity: 2.32044
drift: 18.972 kV sense wires: 1030/1100 V gating grid:-110/+-50 V