Run # 1516 Tape: YA0254 Shift: SHIFT7 Date: 961111 Time: 20:23:12
# of events: 6614 Start block: 7000 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 157 GeV/n Target: PB Thickness: 224 mg
Trigger: B*S_BAR*VETO S3/S4/S5: 350 mV VETO: 127 mV
Magnet conf.: Magnet#1: 0 A/ -0.0 T Magnet#2: 0 A/ -0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Production run, S3 threshold 350 mV, beam def. S1*V0bar*S2bar, MTPCL jumper 3 off, pregate. - STOPPED BY DAQ FAILURE
Atmospheric pressure: 943.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 20.1 C drift velocity: 1.39423
drift: 12.988 kV sense wires: 1110/1060 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 19.9 C drift velocity: 1.40043
drift: 12.941 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 20.0 C drift velocity: 2.30945
drift: 18.996 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 21.3 C drift velocity: 2.32623
drift: 18.948 kV sense wires: 1030/1100 V gating grid:-110/+-50 V