Run # 1529 Tape: YA0257 Shift: SHIFT3 Date: 961112 Time: 20:54:22
# of events: 3609 Start block: 490688 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 157 GeV/n Target: PB Thickness: 224 mg
Trigger: B*S3_BAR*VETO S3/S4/S5: 200 mV VETO: 127 mV
Magnet conf.: Magnet#1: 0 A/ -0.0 T Magnet#2: 0 A/ -0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Production run, S3 threshold 200 mV, beam def. S1*V0_bar*S2, MTPCL jumper 3 off, new pedestals,pregate - STOPPED BY RC FAILURE
Atmospheric pressure: 949.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 20.1 C drift velocity: 1.39404
drift: 12.991 kV sense wires: 1110/1060 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 19.9 C drift velocity: 1.39713
drift: 12.941 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 20.1 C drift velocity: 2.31991
drift: 18.995 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 21.3 C drift velocity: 2.31942
drift: 18.948 kV sense wires: 1030/1100 V gating grid:-110/+-50 V