Run # 1535 Tape: YA0260 Shift: SHIFT4 Date: 961113 Time: 04:54:17
# of events: 12588 Start block: 7000 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 157 GeV/n Target: PB Thickness: 224 mg
Trigger: B*S3_BAR*VETO S3/S4/S5: 200 mV VETO: 127 mV
Magnet conf.: Magnet#1: 0 A/ -0.0 T Magnet#2: 0 A/ -0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Production run, beam def. S1*V0_bar*S2, MTPCL jumper3 off, pregate. S3 threshold 200 mV. - STOPPED BY RC FAILURE
Atmospheric pressure: 951.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 20.2 C drift velocity: 1.39422
drift: 12.991 kV sense wires: 1110/1060 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 19.9 C drift velocity: 1.39699
drift: 12.941 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 20.1 C drift velocity: 2.31627
drift: 18.995 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 21.3 C drift velocity: 2.32159
drift: 18.948 kV sense wires: 1030/1100 V gating grid:-110/+-50 V