Run # 1541 Tape: YA0266 Shift: SHIFT6 Date: 961113 Time: 23:48:22
# of events: 12378 Start block: 7000 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 157 GeV/n Target: PB Thickness: 224 mg
Trigger: B*S3_BAR*VETO S3/S4/S5: 200 mV VETO: 127 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Production run, beam def. S1*V0_bar*S2, MTPCL jumper3 off, pregate. S3 threshold 200 mV. - STOPPED NORMALLY
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1110/1060 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1030/1100 V gating grid:-110/+-50 V