Run # 1598 Tape: YA0297 Shift: SHIFT4 Date: 961119 Time: 17:42:31
# of events: 2297 Start block: 515589 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 157 GeV/n Target: PB Thickness: 224 mg
Trigger: B*S3_BAR S3/S4/S5: 180 mV VETO: 0 mV
Magnet conf.: Magnet#1: 0 A/ -0.0 T Magnet#2: 0 A/ -0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
Peripheral production run. - STOPPED BY DAQ FAILURE
Atmospheric pressure: 943.000 mbar T0: 1.470 us
VT1:
gas: NE:91%/CO2:9% Temp.: 20.0 C drift velocity: 1.39734
drift: 12.991 kV sense wires: 1110/1060 V gating grid:-115/+-45 V
VT2:
gas: NE:91%/CO2:9% Temp.: 19.8 C drift velocity: 1.39436
drift: 12.941 kV sense wires: 970 V gating grid:-115/+-45 V
MTL:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 20.0 C drift velocity: 2.31288
drift: 18.995 kV sense wires: 1030/1100 V gating grid:-110/+-50 V
MTR:
gas: AR:91%/CH4:4.5%/CO2:4.5% Temp.: 21.2 C drift velocity: 2.32625
drift: 18.937 kV sense wires: 1030/1100 V gating grid:-110/+-50 V