Run # 1710 Tape: YA0309 Shift: SHIFT 4 Date: 971007 Time: 05:50:58
# of events: 1169 Start block: 236361 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: P Energy: 450 GeV/n Target:PB Thickness: 0 mg
Trigger: B*S4BAR S3/S4/S5: 8 mV VETO: 0 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
regular data run - redid pedestals due to junk in VT2 - STOPPED BY DAQ FAILURE
Atmospheric pressure: 956.000 mbar T0: 1.470 us
VT1:
gas: NE:90%/CO2:10% Temp.: 20.1 C drift velocity: 1.38918
drift: 12.981 kV sense wires: 1160/111 V gating grid:-115/+-4 V
VT2:
gas: NE:90%/CO2:10% Temp.: 19.7 C drift velocity: 1.39221
drift: 12.929 kV sense wires: 970 V gating grid:-115/+-4 V
MTL:
gas: AR:90%/CH4:5%/CO2:5% Temp.: 20.1 C drift velocity: 2.29465
drift: 18.998 kV sense wires: 1030/110 V gating grid:-110/+-5 V
MTR:
gas: AR:90%/CH4:5%/CO2:5% Temp.: 21.3 C drift velocity: 2.30656
drift: 18.976 kV sense wires: 1030/110 V gating grid:-110/+-5 V