Run # 3988 Tape: YA0740 Shift: KOLLEGGER Date: 1008 Time: 09:05:13 # of events: 29771 Start block: 7000 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:  158 GeV/n   Target:PB           Thickness:    336 mg

Trigger: S1*S2PR*V0*S3BA    S3/S4/S5: 20 mV                   VETO:   1050 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run Pb-Pb central 158GeV, 256tb&Hufman. - STOPPED NORMALLY
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1111/108  V   gating grid:-115/+-4  V

VT2:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 990       V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V