Run # 4421 Tape: YA0882 Shift: ZARANEK/VARG Date: 11007 Time: 07:09:40 # of events: 4177 Start block: 176775 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: P         Energy:  160 GeV/n   Target:PB           Thickness:      0 mg

Trigger: B*S4BAR*CD         S3/S4/S5: 15 mV                   VETO:      0 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run, p + Pb, NCD => 1, RCal rotated (beam at Sec.7) - STOPPED BY DAQ FAILURE
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1111/108  V   gating grid:-115/+-4  V

VT2:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 990       V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V