Run # 4875 Tape: YA1021 Shift: DINKELAKER/R Date: 21013 Time: 11:30:09 # of events: 10163 Start block: 523700 Last block:___________ DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB        Energy:   30 GeV/n   Target:PB           Thickness:    800 mg

Trigger: B*V_CAL            S3/S4/S5: 0 mV                    VETO:      6 mV

Magnet conf.:          Magnet#1:     0 A/  0.0 T    Magnet#2:     0 A/  0.0 T 
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________ Triggers: _________ Trig./B(gated): ________

production run: semicentral(35%) Pb+Pb at 30 GeV, - STOPPED NORMALLY
Atmospheric pressure:     0.000 mbar    T0:   1.470 us

VT1:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1111/108  V   gating grid:-115/+-4  V

VT2:
gas: NE:90%/CO2:10%            Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 990       V   gating grid:-115/+-4  V

MTL:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V

MTR:
gas: AR:90%/CH4:5%/CO2:5%      Temp.:  0.0 C     drift velocity:  0.00000
drift: 0.000   kV        sense wires: 1030/110  V   gating grid:-110/+-7  V