Run # 3935 Tape: YA0701 Shift: DINKELAKER/V Date: 1001 Time: 05:55:48
# of events: 0 Start block: 93236 Last block:___________
DAQ conf.: VT1: ON VT2: ON MTL: ON MTR: ON TOF: ON TOFG: ON
Beam: PB Energy: 158 GeV/n Target:PB Thickness: 336 mg
Trigger: S1*S2PR*V0*S3BA S3/S4/S5: 20 mV VETO: 1050 mV
Magnet conf.: Magnet#1: 0 A/ 0.0 T Magnet#2: 0 A/ 0.0 T
Scaler readings (10 spills): S1: _________ V0: _________ B(gated): ________
Triggers: _________ Trig./B(gated): ________
production run Pb-Pb central 158GeV, 256tb&Hufman - STOPPED NORMALLY
Atmospheric pressure: 0.000 mbar T0: 1.470 us
VT1:
gas: NE:90%/CO2:10% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1111/108 V gating grid:-115/+-4 V
VT2:
gas: NE:90%/CO2:10% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 990 V gating grid:-115/+-4 V
MTL:
gas: AR:90%/CH4:5%/CO2:5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1030/110 V gating grid:-110/+-7 V
MTR:
gas: AR:90%/CH4:5%/CO2:5% Temp.: 0.0 C drift velocity: 0.00000
drift: 0.000 kV sense wires: 1030/110 V gating grid:-110/+-7 V